HOW I DO IT
DAY 10

Go directly to day one

Homewood Music
Tedrow Concertinas



Chuck the buttons in a bench motor



I give the button ten to twelve licks with a mill bastard file



burnish the ends with 0000 steel wool and Johnsons paste wax



Ready to install the action



 locate the lever fulcrum 












an assembled lever/button ready to install.  I have my levers cut from stainless steel at great expense.  Each lever and post has to be riveted one at a time





This is the stock I make up for the pads.






One installed



Several  hours later, every lever and spring carefully installed, buttons leveled


one side done



Both sides completed. 

Day 11